QUALITY MANUAL -> 6.3. PLAINNING OF THE CHANGES (Revision or Update or Cancellation) FOR LORAN QMS

QUALITY MANUAL -> 6.3. Planning of the Changes (Revision or Update or Cancellation) for Loran Quality Management System

Loran top management regularly observe, audit, reports and review all results of the quality management system, and if need a (revision or update or cancellation) change in the quality management system and its processes, changes are carried out in a planned manner, taking into the followings:

  • Revisions of International Standards,
  • Changing of customer requirements,
  • Changing of Loran company structure,
  • New customer requirements,
  • Changes of the regulatory requirements

When Loran determines that changes should be made to the quality management system, the changes are made in a planned manner. Important issues such as resources for changes, process responsible, integration of the change into the quality system and determining the purpose of the change are taken into consideration by Loran top management. The changes are managed and are recorded in the Management Review Minutes as appropriate for the change.


The information contained in this page is the property of Loran Aerospace Incorporated. Unauthorized reproduction, duplication or use of information is prohibited. CONTROLLED COPY - Printed Copies Are Considered UNCONTROLLED - Verify Current Revision Before Use.

Did you find this article useful?